QA/QC & Punch Lists
Run QA/QC inspections, track punch-list items to closure, and build the quality record as the work happens — with photos, sign-off, and PDF reports tied to each project. Included on every plan.
QC officers run inspections from a phone — checklist items, pass/fail, photos, and notes captured on the spot. Each inspection is tied to its project so the quality history of a job is one filtered view, not a folder of loose PDFs.
Log punch items with a responsible party, location, photo, and due status. Items move from open to ready-for-review to closed with a photo of the correction, so the punch walk at the end of the job is a status check, not a discovery exercise.
Run inspections as a request-and-respond loop: the field flags work ready for inspection, QC is notified, and QC accepts it or rejects it back for rework — each with an e-signature. Sequenced QA/QC workflows enforce the order of operations through hold points, so a step can't proceed until the required inspection is signed off, and every inspection transaction is logged. Ready-made workflow templates ship for civil, electrical, and piping, and you can build your own for any process — including a manufacturing-to-QC inspection callout.
Every inspection and punch item carries photos, a timestamp, and a sign-off. When a client questions whether something was inspected, the record — including the before/after photos — is already assembled and exportable to PDF.
QA/QC activity feeds the executive dashboard alongside safety and productivity, so leadership sees open quality issues across the portfolio, not just on the project where someone happened to mention them.
Each item gets a location, responsible party, photo, and status. Items flow from open to ready-for-review to closed (with a correction photo), so you always know what's left and who owns it.
Yes. Inspections and punch lists export to PDF with photos and sign-off, so you hand the owner a professional quality record instead of a marked-up spreadsheet.
Yes. Field PM's QA/QC workflow engine supports inspection callouts with hold points: the field flags work for inspection, QC is notified, and QC approves it or returns it for rework with an e-signature. Every step is tracked, and templates ship for civil, electrical, and piping — or build your own.
It does. Inspections and punch items tie to the project and drawings, and quality activity feeds the executive dashboard alongside safety and productivity.
No — QA/QC inspection logs and punch lists are included on every Field PM plan, and QC officer seats are free and unlimited.
30-day free trial · no credit card · cancel anytime · unlimited foremen, QAQC, safety & subs always free.
Start free trial →Everything below is one platform — no bolted-on point tools.